Metallic Copper glaze
Lead Time: 12-16 Weeks
*Made to order unless otherwise noted.
- Custom sizes available.
- Line voltage connection, with two (x2) E26 Medium base sockets and clear T9 LED 6W bulbs.
- U.L. Labeled.
- Variations occur naturally, no two pieces are identical. Finished dimensions may vary +/- 1”